GEDA 500 Z

  • GEDA 500 Z
  • GEDA 500 Z
  • GEDA 500 Z
  • GEDA 500 Z

These rack and pinion hoists with steel segment masts have earned their good reputation over the years being a reliable partner for construction workers.

Their spacious load platforms offer enough space for two wheelbarrows or large pallets as well as fixing devices for bulky construction materials. The steel mast system allows for easy assembly from the platform up to a height of 100m.

Safe unloading of the transported materials is granted by the platform's being able to be turned by 90°. Loading at the base unit is carried out parallel to the building. This can be very space saving and a decisive feature on narrow construction sites!

A patented mono-axis trailer for transporting and automatically putting down/ loading the hoist is offered as accessory.


Product highlights


GEDA UNI-MAST System

GEDA UNI-MAST System

An ingenious system: can be used on all GEDA rack and pinion hoists from 300 kg to 2,000 kg load capacity.


Technical Data


Cargo Material
Mast system GEDA UNI-MAST
Load capacity (material) 500 kg
Lifting height 100 m
Lifting speed 30 m/min
Power supply 5.5 kW / 400 V / 50 Hz / 16 A
Platform dimension 1.4 m x 1.6 m x 1.1 m / 1.8 m

Appropriate accessories


Floor and wall tie

Floor and wall tie

Hour meter

Hour meter

Landing level safety gate "ECO +"

Landing level safety gate "ECO +"

Cable bin cover

Cable bin cover

Automatic lubrication system

Automatic lubrication system

Limit switch operating plate

Limit switch operating plate

Set of extension tubes

Set of extension tubes

Ring type coupling for lorries

Ring type coupling for lorries

Uniaxial trailer

Uniaxial trailer

Ball type coupling for cars

Ball type coupling for cars

Special frame

Special frame

Trailing cable guide

Trailing cable guide

GEDA UNI-MAST

GEDA UNI-MAST

Set of mast ties

Set of mast ties

Cable bin 100 m

Cable bin 100 m

Cable bin 75 m

Cable bin 75 m

Cable bin 50 m

Cable bin 50 m

Cable bin 25 m

Cable bin 25 m