Contrary to ordinary platforms, these mast climbing platforms are easy to handle. They can be assembled and dismantled without any problems.
For the assembly of the pedestal, grid-supports for standard scaffold components, scaffold coatings, guardrails and toe boards are used. This means economic use in several ways. You can save money through short put-up and dismantling times and you can save your time through multiple-shift usage. Innovative technology in modular system!
The well-known GEDA steel mast segments with captive screws allow for easy assembly directly from the platform.
Their manifold advantages are low investment costs, high safety and stability, not much effort for assembly, space saving transport as well as proper storage.
An ingenious system: can be used on all GEDA rack and pinion hoists from 300 kg to 2,000 kg load capacity.
The automatic lubrication system reduces maintenance costs.
Model | GEDA MCP 750 |
---|---|
Cargo | Persons and material |
Mast system | GEDA UNI-MAST |
Load capacity (material) | 750 kg |
Lifting height | 100 m |
Lifting speed | 9 m/min |
Power supply | 2.2 kW / 400 V / 50 Hz - 60 Hz / 16 A |
Platform width | to 5.6 m |