The transport platform GEDA 500 Z/ZP offers a simple and good-value transport system for materials and people with a spacious transport platform, which is not closed on the top.
The well-know GEDA steel mast segments stand for easy assembly directly from the transport platform up to a height of 100 m. Without using a crane, you can put on the handy 1.5 m mast segments and secure them with captive screws and locking nuts.
In order to prevent people from falling down, hot-dip galvanized landing level safety gates with mechanically locked sliding doors are installed to all loading and unloading points.
An ingenious system: can be used on all GEDA rack and pinion hoists from 300 kg to 2,000 kg load capacity.
The new GEDA all-round protection provides protection from corrosion and its consequential damage, maintains the functionality of components and extends their operating life.
The automatic lubrication system reduces maintenance costs.
Cargo | Persons and material |
---|---|
Mast system | GEDA UNI-MAST |
Load capacity (material) | 850 kg |
Load capacity (persons) | 5 Persons / 500 kg |
Lifting height | 100 m |
Lifting speed | 12 m/min / 24 m/min |
Power supply | 3 kW / 6.1 kW / 400 V / 50 Hz / 16 A |