The base unit includes chassis, cable bin and trailing cable.
The mast with the toothed rack can be fixed to the scaffold using only one tube. The anchoring distances are 4m. The entire unit only requires an area of 1,5 x 1,5m on the ground, which makes it possible to load the hoist parallel to the building without any problems. Unloading at the landing levels can be easily done by turning the platform.
The lightweight platform (only 44 kg) can be turned by 90° to the left and to the right.
The GEDA design and development team has constructed the GEDA 200 Z to be easily serviced and maintained, i.e.easy access to handy components.
A safety bar replaces the bulky assembly guard.
Loading and unloading are done parallel to the building/scaffold, which is space saving and provides good access.
Base unit including chassis, cable bin and trailing cable.
Cargo | Material |
---|---|
Mast system | alu-ladder (with rack) |
Load capacity (material) | 200 kg |
Lifting height | 35 m |
Lifting speed | 25 m/min |
Power supply | 1.7 kW / 230 V / 50 Hz / 16 A |
Platform dimension | 0.8 m x 1.4 m x 1.1 m |